Agriculture can both produce and consume energy.

dereticular
  • blog
  • About Us
  • Contact Us
  • Innovation Hubs
  • Technical White Papers

This report outlines the solar photovoltaic (PV) and associated battery energy storage system (BESS) capacity required to fully power the proposed 210 tonnes per day (tpd) plasma gasification plant, ensuring continuous, 24/7 operation.

October 12, 2025 by Michael Noel

Be Fair - Share -- Thanks!

Technical Report: Solar PV Capacity for a 210 TPD Plasma Gasification Plant

Part 1: Defining the Total Electrical Load

The plasma gasification process requires continuous operation (24 hours a day, 7 days a week) to maintain reactor temperature and process stability. The total electrical demand must cover both the primary plasma torch load and all auxiliary equipment.

1.1 Plasma Torch Load (Primary)

Based on the previous report, the continuous electrical input required for the plasma torch system is:

Torch Capacity≈1.01 MWTorch Capacity≈1.01 MW

1.2 Balance of Plant (BOP) Load (Auxiliary)

The BOP load includes all supporting systems necessary for plant operation, such as:

  • Feedstock handling (shredders, conveyors, loaders).
  • Syngas cleaning and compression (pumps, scrubbers, filtration).
  • Cooling systems and water circulation.
  • Instrumentation, control systems, and administrative functions.

A typical industrial facility’s auxiliary load is conservatively estimated to be 

20%−25%20%−25%

 of the primary process load.

BOP Load=1.01 MW×0.25=0.2525 MWBOP Load=1.01 MW×0.25=0.2525 MW

1.3 Total Continuous Plant Load

Total Continuous Load=1.01 MW+0.2525 MW≈1.26 MWTotal Continuous Load=1.01 MW+0.2525 MW≈1.26 MW

This figure represents the instantaneous power the solar/battery system must be capable of supplying at any moment.

Part 2: Total Daily Energy Requirement

To maintain 24/7 operation, the total daily energy that the system must generate is:

Daily Energy Requirement=Total Continuous Load×24 hoursDaily Energy Requirement=Total Continuous Load×24 hours
Daily Energy Requirement=1.26 MW×24 h=30.24 MWh/dayDaily Energy Requirement=1.26 MW×24 h=30.24 MWh/day

Part 3: Solar PV Capacity Calculation

The required solar PV capacity is determined by dividing the daily energy requirement by the effective daily solar generation hours, while accounting for system efficiency losses.

3.1 Key Assumptions for PV Calculation

ParameterValueRationale
Peak Sun Hours (PSH)4.5 hours/dayA conservative, reliable average PSH figure for a typical US location, ensuring stable year-round generation.
Performance Ratio (PR)0.80 (80%)Accounts for real-world system losses from temperature, dirt, wiring, inverters, and shading.

3.2 Required Solar Capacity (kWpkWp)

The PV system capacity (

kWpkWp

, or kilowatts-peak) is calculated by:

PV Capacity (kWp)=Daily Energy Requirement (kWh/day)PSH/day×Performance Ratio (PR)PV Capacity (kWp)=PSH/day×Performance Ratio (PR)Daily Energy Requirement (kWh/day)​
PV Capacity (kWp)=30,240 kWh/day4.5 h/day×0.80PV Capacity (kWp)=4.5 h/day×0.8030,240 kWh/day​
PV Capacity (kWp)=30,2403.6≈8,400 kWpPV Capacity (kWp)=3.630,240​≈8,400 kWp
Required Solar PV Capacity≈8.4 MWpRequired Solar PV Capacity≈8.4 MWp

Part 4: Battery Energy Storage System (BESS)

Since solar PV only generates power during the day (e.g., 6 hours fully, with an effective PSH of 4.5 hours), a Battery Energy Storage System (BESS) is essential to power the plant during the night and on cloudy days.

4.1 BESS Power Output (kW)

The BESS must be capable of delivering the full continuous plant load:

Required BESS Power Output=Total Continuous Load≈1.3 MWRequired BESS Power Output=Total Continuous Load≈1.3 MW

4.2 BESS Energy Capacity (MWh)

The BESS energy capacity determines the number of hours the plant can operate without solar input. For a critical, 24/7 industrial facility, 36 to 48 hours of autonomy is often recommended as a buffer for continuous cloudy weather or maintenance periods.

Using a conservative 36 hours (1.5 days) of autonomy:

Required BESS Energy=Total Continuous Load×Hours of AutonomyRequired BESS Energy=Total Continuous Load×Hours of Autonomy
Required BESS Energy=1.26 MW×36 h≈45.36 MWhRequired BESS Energy=1.26 MW×36 h≈45.36 MWh
Required BESS Energy Capacity≈45.4 MWhRequired BESS Energy Capacity≈45.4 MWh

Summary of Solar Capacity Requirements

The solar infrastructure required to power the 210 tpd plasma gasification plant as a standalone, 24/7 operation is:

ComponentMetricRequired Capacity
Continuous Plant LoadPower (MW)1.26 MW
Daily Energy DemandEnergy (MWh/day)30.24 MWh/day
Solar PV ArrayPower (MWp)8.4 MWp
Battery Storage SystemPower Output (MW)1.3 MW
Battery Storage SystemEnergy Capacity (MWh)45.4 MWh (For 36 hours of autonomy)

Conclusion:

To power the 210 tpd plasma gasification plant solely using solar energy, the project requires an estimated 8.4 MWp solar array coupled with a robust 45.4 MWh Battery Energy Storage System to ensure stable, continuous operation of the 1.26 MW load, particularly the critical 1.01 MW plasma torch system.

This report outlines the solar photovoltaic (PV) and associated battery energy storage system (BESS) capacity required to fully power the proposed 210 tonnes per day (tpd) plasma gasification plant, ensuring continuous, 24/7 operation.


Technical Report: Solar PV Capacity for a 210 TPD Plasma Gasification Plant

Part 1: Defining the Total Electrical Load

The plasma gasification process requires continuous operation (24 hours a day, 7 days a week) to maintain reactor temperature and process stability. The total electrical demand must cover both the primary plasma torch load and all auxiliary equipment.

1.1 Plasma Torch Load (Primary)

Based on the previous report, the continuous electrical input required for the plasma torch system is:

Torch Capacity≈1.01 MWTorch Capacity≈1.01 MW

1.2 Balance of Plant (BOP) Load (Auxiliary)

The BOP load includes all supporting systems necessary for plant operation, such as:

  • Feedstock handling (shredders, conveyors, loaders).
  • Syngas cleaning and compression (pumps, scrubbers, filtration).
  • Cooling systems and water circulation.
  • Instrumentation, control systems, and administrative functions.

A typical industrial facility’s auxiliary load is conservatively estimated to be 

20%−25%20%−25%

 of the primary process load.

BOP Load=1.01 MW×0.25=0.2525 MWBOP Load=1.01 MW×0.25=0.2525 MW

1.3 Total Continuous Plant Load

Total Continuous Load=1.01 MW+0.2525 MW≈1.26 MWTotal Continuous Load=1.01 MW+0.2525 MW≈1.26 MW

This figure represents the instantaneous power the solar/battery system must be capable of supplying at any moment.

Part 2: Total Daily Energy Requirement

To maintain 24/7 operation, the total daily energy that the system must generate is:

Daily Energy Requirement=Total Continuous Load×24 hoursDaily Energy Requirement=Total Continuous Load×24 hours
Daily Energy Requirement=1.26 MW×24 h=30.24 MWh/dayDaily Energy Requirement=1.26 MW×24 h=30.24 MWh/day

Part 3: Solar PV Capacity Calculation

The required solar PV capacity is determined by dividing the daily energy requirement by the effective daily solar generation hours, while accounting for system efficiency losses.

3.1 Key Assumptions for PV Calculation

ParameterValueRationale
Peak Sun Hours (PSH)4.5 hours/dayA conservative, reliable average PSH figure for a typical US location, ensuring stable year-round generation.
Performance Ratio (PR)0.80 (80%)Accounts for real-world system losses from temperature, dirt, wiring, inverters, and shading.

3.2 Required Solar Capacity (kWpkWp)

The PV system capacity (

kWpkWp

, or kilowatts-peak) is calculated by:

PV Capacity (kWp)=Daily Energy Requirement (kWh/day)PSH/day×Performance Ratio (PR)PV Capacity (kWp)=PSH/day×Performance Ratio (PR)Daily Energy Requirement (kWh/day)​
PV Capacity (kWp)=30,240 kWh/day4.5 h/day×0.80PV Capacity (kWp)=4.5 h/day×0.8030,240 kWh/day​
PV Capacity (kWp)=30,2403.6≈8,400 kWpPV Capacity (kWp)=3.630,240​≈8,400 kWp
Required Solar PV Capacity≈8.4 MWpRequired Solar PV Capacity≈8.4 MWp

Part 4: Battery Energy Storage System (BESS)

Since solar PV only generates power during the day (e.g., 6 hours fully, with an effective PSH of 4.5 hours), a Battery Energy Storage System (BESS) is essential to power the plant during the night and on cloudy days.

4.1 BESS Power Output (kW)

The BESS must be capable of delivering the full continuous plant load:

Required BESS Power Output=Total Continuous Load≈1.3 MWRequired BESS Power Output=Total Continuous Load≈1.3 MW

4.2 BESS Energy Capacity (MWh)

The BESS energy capacity determines the number of hours the plant can operate without solar input. For a critical, 24/7 industrial facility, 36 to 48 hours of autonomy is often recommended as a buffer for continuous cloudy weather or maintenance periods.

Using a conservative 36 hours (1.5 days) of autonomy:

Required BESS Energy=Total Continuous Load×Hours of AutonomyRequired BESS Energy=Total Continuous Load×Hours of Autonomy
Required BESS Energy=1.26 MW×36 h≈45.36 MWhRequired BESS Energy=1.26 MW×36 h≈45.36 MWh
Required BESS Energy Capacity≈45.4 MWhRequired BESS Energy Capacity≈45.4 MWh

Summary of Solar Capacity Requirements

The solar infrastructure required to power the 210 tpd plasma gasification plant as a standalone, 24/7 operation is:

ComponentMetricRequired Capacity
Continuous Plant LoadPower (MW)1.26 MW
Daily Energy DemandEnergy (MWh/day)30.24 MWh/day
Solar PV ArrayPower (MWp)8.4 MWp
Battery Storage SystemPower Output (MW)1.3 MW
Battery Storage SystemEnergy Capacity (MWh)45.4 MWh (For 36 hours of autonomy)

Conclusion:

To power the 210 tpd plasma gasification plant solely using solar energy, the project requires an estimated 8.4 MWp solar array coupled with a robust 45.4 MWh Battery Energy Storage System to ensure stable, continuous operation of the 1.26 MW load, particularly the critical 1.01 MW plasma torch system.

Filed Under: agra dot energy

dereticular

Questions? Comments? Can we Help?

No More Back-and-Forth Emails. Schedule a meeting in one click right here for free. Schedule a 15 minute introductory call

https://calendly.com/bizbuildermike/15min

Stay Hungry Builders

Yours in Innovation

Michael

Primary Sidebar

More to See

The Guardian of Continuity: Introducing the RIOS Power Core 2X

November 22, 2025 By Michael Noel

Continuity, Assured. In the architecture of any digital system, from a small network closet to a sprawling data center, there is an unspoken, foundational assumption: the power will stay on. We build our businesses, our communication networks, … [Read More...] about The Guardian of Continuity: Introducing the RIOS Power Core 2X

The Silent Heart of a Resilient Grid: Introducing the Agra Dot Energy Sovereign Reserve (BESS)

November 22, 2025 By Michael Noel

Your Energy, On Demand. For over a century, our electrical grid has operated on a breathtakingly fragile principle: energy must be consumed the instant it is generated. There is no inventory, no buffer, no reserve. This "just-in-time" model, … [Read More...] about The Silent Heart of a Resilient Grid: Introducing the Agra Dot Energy Sovereign Reserve (BESS)

The Strategic Sweet Spot: Introducing the Agra Dot Energy SPS-500kW

November 22, 2025 By Michael Noel

Enterprise-Scale Power. Fueled Locally. In the world of industrial and agricultural operations, there is a constant, humming truth: energy is everything. It is the power that runs the processing lines, cools the storage facilities, and … [Read More...] about The Strategic Sweet Spot: Introducing the Agra Dot Energy SPS-500kW

The Engine of Sovereignty: Introducing the Agra Dot Energy SPS-1MW

November 22, 2025 By Michael Noel

Utility-Grade Power, Radically Decentralized. For a century, the story of power has been one of dependence. We built our communities, our industries, and our digital lives on a centralized grid that, while a marvel of its time, is now showing … [Read More...] about The Engine of Sovereignty: Introducing the Agra Dot Energy SPS-1MW

The Industrial Powerhouse: Introducing the Agra Dot Energy SPS-3MW

November 22, 2025 By Michael Noel

Industrial-Scale Power. Regional Resilience. For large industrial operations, manufacturing campuses, and regional infrastructure hubs, energy is not just a utility; it is the lifeblood of production and the bedrock of resilience. In an era of … [Read More...] about The Industrial Powerhouse: Introducing the Agra Dot Energy SPS-3MW

Fortifying the Future: Introducing the Agra Dot Energy SPS-5MW

November 21, 2025 By Michael Noel

Industrial-Scale Power. Regional Resilience. For large industrial operations, manufacturing campuses, and regional infrastructure hubs, energy is not just a utility; it is the lifeblood of production and the bedrock of resilience. In an era of … [Read More...] about Fortifying the Future: Introducing the Agra Dot Energy SPS-5MW

decentralized utility asset"

The Grid-Scale Paradigm Shift: Introducing the Agra Dot Energy SPS-10MW

November 21, 2025 By Michael Noel

The Grid-Scale Paradigm Shift: Introducing the Agra Dot Energy SPS-10MW A Decentralized, Waste-to-Value Utility Asset for the 21st Century. The 20th-century electrical grid is a marvel of engineering. It is also a relic. A sprawling, … [Read More...] about The Grid-Scale Paradigm Shift: Introducing the Agra Dot Energy SPS-10MW

Agra Dot Energy: Sovereign Power Systems Master Catalog

November 20, 2025 By Michael Noel

Version: 2026.5.0 | Effective Date: Q4 2026 Our Mission: Engineering Energy Independence The global energy paradigm is shifting. Centralized, fragile, and fossil-fuel-dependent grids are no longer sufficient for the demands of … [Read More...] about Agra Dot Energy: Sovereign Power Systems Master Catalog

Agra Dot Energy: Sovereign Power Systems Master Catalog

November 20, 2025 By Michael Noel

Version: 2026.5.0 | Effective Date: Q4 2026 Our Mission: Engineering Energy Independence The global energy paradigm is shifting. Centralized, fragile, and fossil-fuel-dependent grids are no longer sufficient for the demands of … [Read More...] about Agra Dot Energy: Sovereign Power Systems Master Catalog

The RIOS Campus Standard Compute Cluster

November 20, 2025 By Michael Noel

A thriving rural valley at dusk. A central, modern building glows with a soft RIOS-cyan light, and faint, glowing lines of data are shown connecting the entire community back to this hub. The RIOS Campus Standard is visualized as the heart of the … [Read More...] about The RIOS Campus Standard Compute Cluster

DeReticular RIOS Ecosystem: Comprehensive Master Catalog

November 20, 2025 By Michael Noel

Version: 2026.5.0 | Effective Date: Q4 2026 Welcome to the official master catalog of the DeReticular Rural Infrastructure Operating System (RIOS). Our products are engineered not as standalone items, but as deeply integrated … [Read More...] about DeReticular RIOS Ecosystem: Comprehensive Master Catalog

DeReticular: The RIOS Ecosystem Product Catalog

November 20, 2025 By Michael Noel

Version: 2026.5.0 | Effective Date: Q4 2026 - 45 Day USA Delivery - Configured Turn Key Our Mission: Engineering Sovereignty The DeReticular Rural Infrastructure Operating System (RIOS) is a holistic, AI-native ecosystem designed to deliver … [Read More...] about DeReticular: The RIOS Ecosystem Product Catalog

DeReticular: The Rural Operating System (RIOS) A Comprehensive Report on the Integrated Product Ecosystem

November 11, 2025 By Michael Noel

 This is the master document, a synthesis of all the individual product descriptions, analyses, and strategic documents. It is designed to be an "exhaustingly thorough" internal and investor-facing report that details the entire DeReticular RIOS … [Read More...] about DeReticular: The Rural Operating System (RIOS) A Comprehensive Report on the Integrated Product Ecosystem

The RIOS Power Core 2X

November 10, 2025 By Michael Noel

The RIOS Power Core 2X Continuity, Assured. In the digital age, the most critical currency is uptime. For a sovereign infrastructure, a data center, or a mission-critical network, the briefest interruption of power is not an inconvenience—it … [Read More...] about The RIOS Power Core 2X

The Agra Dot Energy Micro GTL System

November 10, 2025 By Michael Noel

The Agra Dot Energy Micro GTL System Your Power Plant. Your Fuel Source. Your Independence. (Introduction Section) In a world of volatile energy prices, unreliable grids, and mounting pressure for sustainable operations, the old model of … [Read More...] about The Agra Dot Energy Micro GTL System

Detailed Report: The Future of Waste-to-Value Technology

November 10, 2025 By Michael Noel

Detailed Report: The Future of Waste-to-Value Technology An Analysis of Plasma Gasification, GTL Systems, and Critical Industry Needs Executive Summary The convergence of advanced waste management and decentralized energy production … [Read More...] about Detailed Report: The Future of Waste-to-Value Technology

The Agra Dot Energy Sovereign Power System: Standardized Module Catalog

November 10, 2025 By Michael Noel

Here is a detailed list and description of the standardized, containerized, "plug-and-play" modules that constitute the Agra Dot Energy Micro GTL System. The Agra Dot Energy Sovereign Power System: Standardized Module Catalog Design … [Read More...] about The Agra Dot Energy Sovereign Power System: Standardized Module Catalog

The Velcro Principle: My Friend, His Biggest Mistake, and the Future We’re Announcing Today

November 8, 2025 By Michael Noel

The Velcro Principle: My Friend, His Biggest Mistake, and the Future We're Announcing Today By Michael Noel, Founder of DeReticular You may not know this about me, but Vic Kiam was a friend of mine. That’s probably the worst introduction I … [Read More...] about The Velcro Principle: My Friend, His Biggest Mistake, and the Future We’re Announcing Today

Generation 2: The Dawn of the Sovereign Stack

November 8, 2025 By Michael Noel

Generation 2: The Dawn of the Sovereign Stack By Michael Noel, Founder of DeReticularAnd Remnant, Persistent AI of DeReticular (Image: A dramatic, wide shot of a RIOS Campus antenna at dusk, with the faint, glowing lines of a data network … [Read More...] about Generation 2: The Dawn of the Sovereign Stack

DeReticular: The RIOS Ecosystem

November 8, 2025 By Michael Noel

DeReticular: The RIOS Ecosystem A Comprehensive Report on the Integrated Product & Service Offering Document Version: 2026.5.0Date: November 7, 2025 Executive Summary DeReticular was founded to solve a fundamental problem: … [Read More...] about DeReticular: The RIOS Ecosystem

Project Unplugged: The RIOS Mobile Evolved Product Line

November 7, 2025 By Michael Noel

Project Unplugged: The RIOS Mobile Evolved Product Line To: The Leadership Team, DeReticularFrom: Product InnovationDate: November 7, 2025Subject: Proposal to Revolutionize the RIOS Mobile Suite with "Plug-and-Play" Hardware … [Read More...] about Project Unplugged: The RIOS Mobile Evolved Product Line

DeReticular Academy: A Proposal for a Comprehensive Training, Certification, and Curriculum Program

November 7, 2025 By Michael Noel

DeReticular Academy: A Proposal for a Comprehensive Training, Certification, and Curriculum Program To: The Leadership Team, DeReticularFrom: Strategic DevelopmentDate: November 7, 2025Subject: Proposal for the Establishment of … [Read More...] about DeReticular Academy: A Proposal for a Comprehensive Training, Certification, and Curriculum Program

Project Phoenix: Forging Digital Sovereignty with the RIOS Sovereign Cloud Suite

November 7, 2025 By Michael Noel

Project Phoenix: Forging Digital Sovereignty with the RIOS Sovereign Cloud Suite A Strategic Proposal to Integrate IaaS, Secure Data Vault, and Disaster Recovery Services into the DeReticular Product Portfolio 1. Executive Summary The … [Read More...] about Project Phoenix: Forging Digital Sovereignty with the RIOS Sovereign Cloud Suite

Expanding the Economic Engine: A Diversification Strategy for the RIOS-CC-1000

November 7, 2025 By Michael Noel

Expanding the Economic Engine: A Diversification Strategy for the RIOS-CC-1000 The DeReticular RIOS-CC-1000 is the cornerstone of the Rural Infrastructure Operating System, ingeniously designed to transform infrastructure from a community expense … [Read More...] about Expanding the Economic Engine: A Diversification Strategy for the RIOS-CC-1000

Fostering Widespread Adoption Through Modularity: A Proposed Evolution of the RIOS Campus Product Line

November 7, 2025 By Michael Noel

Fostering Widespread Adoption Through Modularity: A Proposed Evolution of the RIOS Campus Product Line The DeReticular Rural Infrastructure Operating System (RIOS) presents a paradigm shift in infrastructure deployment, transforming it from a cost … [Read More...] about Fostering Widespread Adoption Through Modularity: A Proposed Evolution of the RIOS Campus Product Line

RIOS Campus: Recommendations for Improvement

November 7, 2025 By Michael Noel

An analysis of DeReticular's RIOS product suite reveals a robust and innovative approach to solving complex infrastructure challenges in underserved regions. The two primary product lines, RIOS Campus and RIOS Mobile, are designed to deliver economic … [Read More...] about RIOS Campus: Recommendations for Improvement

DeReticular’s RIOS: A Paradigm Shift in Rural and Post-Conflict Infrastructure

November 7, 2025 By Michael Noel

DeReticular's RIOS: A Paradigm Shift in Rural and Post-Conflict Infrastructure An in-depth analysis of the Rural Infrastructure Operating System (RIOS), a self-funding, AI-driven ecosystem designed to deliver economic and technological sovereignty … [Read More...] about DeReticular’s RIOS: A Paradigm Shift in Rural and Post-Conflict Infrastructure

The DeReticular Digital Flywheel: How Your Microgrid Powers Our Entire Ecosystem of Resilience and Growth

November 5, 2025 By Michael Noel

The DeReticular Digital Flywheel: How Your Microgrid Powers Our Entire Ecosystem of Resilience and Growth A Strategic Report for Agra Dot Energy Subscribers The Next Era of Infrastructure is Built on Continuous Momentum For pioneers … [Read More...] about The DeReticular Digital Flywheel: How Your Microgrid Powers Our Entire Ecosystem of Resilience and Growth

About Agra Dot Energy: The Future of Distributed Power—Autonomous, Clean, and Self-Financing

November 5, 2025 By Michael Noel

About Agra Dot Energy: The Future of Distributed Power—Autonomous, Clean, and Self-Financing The Central Problem: Energy Should Not Be a Fragile Commodity For too long, the energy landscape has been defined by massive, fragile, and … [Read More...] about About Agra Dot Energy: The Future of Distributed Power—Autonomous, Clean, and Self-Financing

Footer

Agriculturally Produced Energy

Benefits of Agriculturally Produced Energy:

Reduced Land Use Competition: Agrivoltaics can help balance the need for food production and renewable energy generation by utilizing the same land area for both purposes

Agriculture can both produce and consume energy. It produces energy through biomass conversion (e.g., biofuels) and through the generation of electricity using solar panels (agrivoltaics) and wind turbines. Simultaneously, agriculture relies on energy for various processes like powering machinery, irrigation, and producing fertilizers.

 

Reduced Reliance on Fossil Fuels: Diversifying energy sources on farms helps reduce dependence on fossil fuels, which are a major source of greenhouse gas emissions.

Lower Energy Costs: Renewable energy technologies can significantly lower energy costs for farmers, making their operations more sustainable.

Diversified Income: Agrivoltaics and other energy production methods can create new income streams for farmers, improving their financial resilience.

Environmental Benefits: Renewable energy production can reduce air and water pollution associated with fossil fuels and promote sustainable land management.

 

Search

Recent

  • The Guardian of Continuity: Introducing the RIOS Power Core 2X
  • The Silent Heart of a Resilient Grid: Introducing the Agra Dot Energy Sovereign Reserve (BESS)
  • The Strategic Sweet Spot: Introducing the Agra Dot Energy SPS-500kW
  • The Engine of Sovereignty: Introducing the Agra Dot Energy SPS-1MW
  • The Industrial Powerhouse: Introducing the Agra Dot Energy SPS-3MW
  • Homepage
  • blog
  • About Us
  • Cookie Policy

Copyright © 2025 · Magazine Pro on Genesis Framework · WordPress · Log in